This work consisted of a file set layout with a train coming through the wall and a motorbike traveling over the railway tracks. This work included a lot of drop shadows to the floor to create depth into the completed scene. This also included shadows from the train to create a realistic look.
Floor System:
Once we had completed the meshing and joint detail, we applied a self levelling epoxy over the floor surfacing to make the floor level. The advantages of using pure epoxy as a leveler is that is doesn’t re-soften if hit with moisture. The additional scope of the works was to have a beach scene that could project a turtle hatching scene – which is demonstrated in our photos. The floor projection color was customized for the optimum color that would show the best effect.
Floor System: